Cookies on Zenoot

This website uses cookies to ensure you get the best experience on our website. More info

2 minute read - 9th June 2023

Nissan builds 11 millionth vehicle at Sunderland plant

The Nissan team at its Sunderland plant are celebrating building the 11 millionth vehicle since production started in 1986. The milestone means that, on average, a new car has rolled off the line at the plant every two minutes, every hour of every day, for 37 years.

The 11 millionth car was a Blade Silver Qashqai e-POWER, one of three electrified models currently built at the plant. The first car, built in 1986, was a white Nissan Bluebird, which took about 22 hours to build. Today, a top of the range Qashqai e-POWER takes about 8.5 hours.

The UK’s largest car manufacturer by volume, Nissan Sunderland is home to a workforce of around 6,000 people. Nissan also supports a further 30,000 UK jobs in the supply chain, with about five million parts arriving every day at the plant.

Nissan has produced its 11 millionth UK-made vehicle at its Sunderland plant / Picture: Nissan GB

The 11 million is made up of nine different models, with 22 variants. Four models, Qashqai, Micra, Primera and Juke have gone past seven figures, with Qashqai the all-time highest at more than four million. Last year, Qashqai was the UK’s best-selling new car, the first British-built model to win the award in 24 years.

Adam Pennick, vice president for manufacturing, at Nissan Sunderland, said: “This milestone reflects the vast experience that our world-class manufacturing team has in delivering the quality cars that our customers love. We’ve come a long way since production first started with some iconic models on the way. But we’re always looking forward, and our fully electrified range and EV36Zero plan mean we have an exciting and sustainable future ahead.”

Last summer, Qashqai e-POWER and Juke Hybrid both went into production in Sunderland which, added to the all-electric Nissan LEAF, means the full range at the plant is electrified.  So far more than 50,000 Qashqai e-POWER and 20,000 Juke HYBRID have been built.

The plant is also moving forward with its EV36Zero project, which consists of three main elements: a new electric vehicle, a 12GWh gigafactory with the company’s battery partner Envision AESC, and a microgrid to deliver 100% renewable energy to Nissan and suppliers.


This content is copyright of Zenoot Ltd and its originator. You can use extracts, share or link to this page and you may draw the attention of others to content posted on our site. Bulk copying of text is not permitted. You can view our Terms of Use here.